Four Ways to Make Money in Government Contracting
You can prime the work yourself, prime and subcontract a piece, manage suppliers and keep the spread, or subcontract to primes who already hold the contract. Pick the model that matches your capability.
There are four ways I see small companies get paid in government contracting. You win the contract and perform it yourself. You win it and subcontract the slice you do not do. You win it, buy the goods or the specialty work from suppliers, and keep a margin for managing delivery. Or you skip the prime role on purpose and perform as a subcontractor to companies that already hold the work. An older slide sometimes collapses those into three labels and leaves subcontracting off the picture. I keep four, because the fourth one is how a lot of capable firms should start.
The model is a choice about capability. It is not a personality type. A company can prime a janitorial contract, buy PPE as a supplier on a different buy, and subcontract electrical work to a prime the same quarter. The notice decides which hat is honest.
1. In-house prime: you win it and you do it
This is the clearest model. Your company is the prime. Your people perform the IT work, the construction trade, the facility service, or the professional service the government bought. You invoice the government. You carry the performance risk.
Use it when the scope matches work you have done and can staff for the whole period. The evaluation factors will ask about that. The value proposition has to describe the method, not the fact that you “do this kind of work.”
Prime also means you are the offeror. Registration, representations, bonding if the notice requires it, and the signature all sit with you. What a UEI and a CAGE code are is the federal ID layer. State portals have their own vendor records.
2. Prime, with a subcontractor on the piece you do not perform
You still win the contract. You perform the part you are built for, and you hire a company for the rest. I use a relocation job as the picture. One part is packing and loading. The other part is the truck that hauls the goods. If your crew can pack and load, a trucking company can be the subcontractor who drives. You do not pretend to own the trucks. You do not pretend the trucking company is the prime.
The split has to be real, and it has to be legal under the notice. On many small-business set-asides, the limitation on subcontracting restricts how much of the work a small prime may pass through. How to become a subcontractor covers teaming from the other side of the table, and it is the page I want you to read before you promise a percentage you have not checked against the clause. I will not give you a universal “do 80 percent yourself” rule. That was an illustration in a class, not a FAR number.
Price the subcontractor’s quote into your offer before you submit. A handshake is not a price.
3. Project manager and supplier: you coordinate, and you keep the margin
On products, and on some simple services, the prime’s job is to understand the requirement, collect supplier quotes, add a margin that still wins, and deliver. I have used this on PPE, medical supplies, equipment, and materials. The government awards the contract to you. You buy from the distributor who can actually ship. You are responsible for the delivery matching the specification.
The same shape shows up in services when you are coordinating trades you do not employ full time, such as a landscaping or tree-trimming job you can supervise and insure but do not staff every day. Be honest about who is on the tools. If the solicitation wants your employees in named roles, a supplier quote does not answer the factor.
This model dies when you cannot get a real quote in time, or when you add so much margin that the price is no longer competitive under the evaluation method. How to price a bid is the build-up. A number you cannot explain is not a strategy.
Healthcare and supply pages on this site, healthcare and supplies and materials, are the industry context. They are not a claim that any of those markets are easy. During a surge the government buys more of certain goods. In an ordinary year it still buys them. Either way, you need a supplier who can fill the order you just promised.
4. Purposeful subcontracting
The fourth model is the one people skip. You identify primes who already hold contracts in your trade, and you perform a portion under them. You are not waiting to be the prime. You are selling a role: the crew, the product line, the license, the geography.
Large primes on contracts over the subcontracting-plan threshold have a reason to talk to you. Set-asides and subcontracting plans explains FAR 19.702. The plan does not hire you. Your outreach does. Find the award on USAspending.gov, find the prime, and pitch a scope you can start. How to become a government subcontractor is the step-by-step.
There is a cousin of this model I should name so you do not confuse it with performance. You can help another company bid: research, pricing support, proposal drafts. That is consulting. They hold the contract if they win. You get paid under your agreement with them, which you should write down. Consulting is a way to learn the paperwork. It is a weak only-model if you want a company that performs, because you do not control the work and you may not get past performance in your own name. Read the solicitation’s rules on whose experience counts before you assume a consulting role becomes a citation.
Choose, then run the five steps
The model is step zero. The pursuit is the five steps.
- Get contract ready for the role you picked. A subcontractor still wants a clean SAM.gov record if the prime or the agency will look. A prime on a federal bid needs an active registration.
- Find contracts that fit the model. A product reseller searches supply buys. A subcontractor searches primes. A prime searches notices the crew can staff.
- Gather resources and solutions: the trucking firm, the distributor quote, the resumes, the teaming agreement.
- Draft the offer the role requires. A prime writes the proposal. A sub writes a quote and a capability fit for the prime’s volume.
- Submit and follow up. If you are the prime, you own the deadline. If you are the sub, you own the date the prime gave you, which is earlier.
Bid or no-bid applies to all four. “The juice” is the margin and the learning after you subtract the work, the risk, and the partner’s share. If the math is bad, pass.
Match the model to the set-aside and the plan rule
The model has to survive the clauses in the notice. FAR 19.502-2 is the rule of two. The contracting officer sets the buy aside for small business when the office expects offers from at least two responsible small businesses and award at a fair market price. On that notice the prime offer comes from a small business. A large partner can perform a slice the clause allows. The offeror the rule was written for is still the small firm.
FAR 19.702 is the subcontracting-plan rule on the other side of the table. A plan is required on a negotiated award expected to exceed $900,000, or $2 million for construction, when subcontracting possibilities exist. Other-than-small businesses submit it. Small businesses are outside that paperwork. If the business that holds the plan fails to make a good-faith effort, the failure is a material breach. A large prime has a reason to meet a firm that can perform a defined slice. Send a price and a scope you can start, and the conversation is a pursuit.
Limitations on subcontracting live in 13 CFR 125.6. I send owners to SBA’s prime and subcontracting page before anyone promises a workshare. I will not print a percentage here. The clause in your notice is the share that binds you. Read it before you pick the prime-plus-sub model or the supplier model on a services set-aside. A product buy and a services set-aside follow different pass-through rules. The notice tells you which one you are holding.
Put the legal name, the size standard, and the record on one page
When you are the federal prime, the contract has to use the legal name or the DBA, and the address, from the SAM record for your unique entity identifier. FAR 4.1102 is the rule. Contracting officers leave that SAM entry as you registered it. If the cover page and the record disagree, fix the record before you draft. That fix is step one, get contract ready. GSA’s registration page tells you to get the UEI on SAM.gov, have the TIN, any existing CAGE or NCAGE, EFT banking, and your NAICS ready, and allow up to 10 business days after you submit before you treat the registration as active.
Size decides whether the set-aside is yours to prime. SBA’s size guidance ties the standard to the NAICS code on the notice. Most manufacturing standards are 500 employees or fewer. Most non-manufacturing standards are average annual receipts under $7.5 million, and some industries use a different line. Federal contracting uses a five-year receipts average and a 24-month employee average. Affiliates are included. If you believe the notice assigned the wrong NAICS code, the appeal to SBA’s Office of Hearings and Appeals runs 10 days. After that window, the code on the notice is the code you bid.
A short history is two different questions. FAR 9.104-1 states the responsibility standards. Lack of history alone is not a responsibility finding, except as FAR 9.104-2 provides. FAR 15.305 is the evaluation rule. When past performance is a factor and you have no relevant history, the treatment is neutral. Neutral leaves the result to the other factors. Write the method, the crew, and the price. Gather the proof you actually have at step three, before the draft mentions a resume you cannot attach.
Fill the row in before you price
I use one table so the model is a set of blanks you can finish. An empty cell means you are still gathering resources.
| Model | Who holds the government contract | What you gather | What you send |
|---|---|---|---|
| In-house prime | Your company | Crew, supervision, and proof you can perform the scope | The offer, in the SAM legal name or DBA |
| Prime plus a sub | Your company | A priced quote and an agreement for the slice someone else performs | The offer, with that slice inside the subcontracting limit |
| Supplier and manager | Your company | A distributor or trade quote that meets the specification | The offer, with your margin and the delivery plan |
| Purposeful sub | The prime | The prime’s scope, the prime’s due date, and your cost | A quote to the prime, on the prime’s calendar |
Price the row you picked. On a service over $2,500, FAR 22.1002-1 puts mandatory wage and fringe provisions in the contract, and the service contract stays within 5 years. An in-house prime prices the company’s own hours against that wage determination, plus supervision. A prime-plus-sub prices the subcontractor’s quote plus the cost of managing it. A supplier prices the distributor quote, the freight, and a margin that still fits the evaluation. A purposeful sub prices only the slice, and sends it early enough for the prime to load it into the offer.
Step two, find contracts, means you search for notices that fit one row. Contract search can hold that filter. SUBNet is one place large primes post subcontracting leads. A listing is a lead. Confirm the scope, then send a quote you would sign. Step five splits by role. The prime submits on the government’s deadline. The sub submits on the earlier date the prime set. After award, ask how the prime’s proposal described your company, and keep the performance record in your own file when the work was yours.
Frequently asked questions
What are the four ways to make money on government contracts?
Perform the work yourself as the prime. Win as the prime and subcontract the part you do not perform. Win the award, buy from suppliers, and deliver with a margin. Or subcontract on purpose to companies that already hold the contracts. The right one depends on what you can actually do.
What is the difference between a prime and a subcontractor?
The prime holds the contract with the government and is responsible for the whole requirement. A subcontractor holds a contract with the prime to perform a portion. The government pays the prime. The prime pays the sub, under their agreement.
Can I win a contract and have someone else do all the work?
Sometimes a buy is mostly products and your job is to source, mark up, and deliver. On a services set-aside, the limitation on subcontracting can require the small-business prime to perform a minimum share. Read the clause in the solicitation before you plan to pass the entire job through.
Is consulting the same as subcontracting?
Consulting, in the way I use the word here, means helping another company find and bid the work. Subcontracting means performing a portion under their prime contract. You can do both. They are different agreements, and only the subcontract is performance of the government work.
Which model should a new company use first?
Use the one you can perform this month. A product reseller can quote suppliers. A services firm can prime small notices it can staff, or subcontract to a prime who needs that trade. Do not pick a model because a video called it easy. Pick it because the notice and your crew match.
Name the model on the next notice you save
Write it at the top of the pursuit: prime, prime plus sub, supplier, or subcontractor. If you cannot name it, you are not ready to price.
Start for free and track the role next to the notice. The plans lay out the platform and the hands-on options. The guided path is start. If you want help naming the model on a live notice, Book a Call.