USA Contract Solutions · You're one contract away.

Industry

How do construction firms find government work?

Construction notices are specific about the site, the trade, the bonding, and the license. Govacha helps you find and track them, and consulting helps you decide whether to bid.

Federal and local construction is full of work that looks like your last private job and is not. The wage rules, the security rules, and the liquidated damages are in the package. Read them before you like the location.

Common codes include commercial building (236220), highway and street (237310), and specialty trades such as plumbing and HVAC (238220). Those are examples. The notice’s code and your license decide the fit, not this paragraph.

Bonding capacity is a filter. If you cannot bond the estimated price, mark the notice a pass. Chasing it because the title says “renovation” wastes the estimator.

Use search for the place of performance you can staff, then a compliance matrix for the volumes the agency actually asked for. Drawings are part of the requirement. A narrative that never mentions the sheet numbers is not a construction proposal.

State and local portals matter as much as SAM.gov for a lot of building work. The federal registration is still required when the federal notice says it is.

Questions

Is every construction notice a NAICS 236220 buy?

No. Building construction, heavy civil, and specialty trades use different codes. Use the code on the notice and the one that matches the work you can staff.

Does software replace a bonding company?

No. If the notice requires a bond, you need the bond. A pipeline row does not issue one.

Close

You're one contract away.

Start with the notices that match the work you can do. We help you get contract ready, decide what to bid, and move the proposal forward.