Manufacturing Government Contracts: DLA, Pricing, and First Article Testing
How a manufacturing bid is judged: DLA and the military services, shop capability, a defensible price, and what first article testing asks you to prove.
Manufacturing awards go to the shop that can make the part to the specification, in the quantity, on the delivery the contract states, at a price that survives the evaluation. If you run a machine shop, a fabrication line, or a small plant, the government is not buying a capability statement. It is buying units. A low unit price from a process you have not shown is how a good number still loses. We once lost a contract with the best price because we didn’t demonstrate domain authority. On a production buy, domain authority is the equipment, the quality record, and work that looks like this drawing.
This guide sits under the manufacturing industry page. If you only resell the item, use the distributor guide instead.
How the government evaluates a manufacturing bid
Capabilities. What machine, what process, what quantity per week, and which quality checks. The solicitation may ask for a first article before it will accept production. Until that approval exists, a promise that you “can make anything in the print” is not capability.
Pricing. Build the unit price from material, direct labor, the shop burden you actually run, and a fee. How to price a government contract bid is the language. FAR 15.101-2 takes the lowest evaluated price among technically acceptable offers, which is common once the part is defined. FAR 15.101-1 is the tradeoff, when the solicitation says a better approach can cost more. Do not quote a commercial piece-price that ignores first-article cost, special tooling, or a military specification you have not bought the material for.
Experience. Similar parts, similar materials, similar tolerances, delivered before. A commercial job that used the same process is experience when the notice allows it. A famous customer in a different process is not. Past performance when you have none is the reason to start with a quantity you have already made.
Labor and resumes. The estimator, the quality lead, and the programmer or machinist who will run the part are the people the notice sometimes names. A front-office resume does not answer a factor about who will inspect the first article.
Licenses and approvals. Some drawings are export-controlled. Some parts require a qualification or a source approval before you may quote. If the notice says you must already be approved, a new shop is not ready for that item. Domain authority includes a website and a SAM.gov record that describe the processes you actually run, not every process in the NAICS manual.
First article testing, in plain language
FAR 9.302 says first article testing and approval ensures the contractor can furnish a product that conforms to all contract requirements for acceptance. Before requiring it, the contracting officer considers the impact on cost or delivery, the risk of skipping the test, and whether a cheaper method would still ensure quality.
FAR 52.209-3, First Article Approval—Contractor Testing, is the clause when you do the test. You test the number of units the contract fills in, notify the contracting officer so the government may witness, and submit the report to the address and on the schedule the clause states. The government then approves, conditionally approves, or disapproves. Approval does not relieve you from the rest of the specification. Disapproval can require a repeat at your cost. Failure to deliver the report on time, or disapproval, can be treated as a failure to deliver under the Default clause.
Two sentences in that clause decide the cash: before approval, buying material or starting the rest of the quantity is at your risk, and those costs are not allocable to the contract for progress payments or for a convenience-termination settlement. If the approved first article is not consumed in testing, you may be allowed to deliver it as part of the quantity when it meets the contract. The government may waive testing where you have previously furnished identical or similar supplies that were accepted. You request the waiver. You do not assume it.
Alternate I of the clause can require the first article and the production quantity to come from the same facility. If that alternate is in the contract, a plan to machine the sample in one shop and the lot in another is noncompliant.
FAR 9.304 lists the usual exceptions: research or development; products that require qualification before award, such as a qualified products list; products normally sold commercially; and products covered by complete specifications, unless the requirements are so novel or exacting that testing is still justified. Read the solicitation. “Normally not required” is not “never required.”
The cash timing is the part owners skip. If FAR 52.209-3 is in the contract without an authorization to start early, material you buy for the production lot before approval is your money, not an allocable cost. I tell shops to price the first-article units, the test report, and the waiting time as their own block, then price the production lot as a second block that does not start until the notice of approval. A unit price that spreads tooling and first-article scrap across a quantity you are not yet allowed to build will look competitive and then strand the cash. If you are requesting a waiver because the government already accepted the same item from you, say that in the quote and attach the prior contract identity the clause expects you to rely on. A waiver you mention only in a cover email is easy to miss.
Who buys, and what fiscal year 2025 shows for two shop codes
I use two codes a small fabricator can recognize. NAICS 332710, Machine Shops, has a 500-employee size standard in 13 CFR 121.201, as displayed on eCFR on November 18, 2026. NAICS 332999, All Other Miscellaneous Fabricated Metal Product Manufacturing, has a 750-employee standard. Aircraft parts and other manufacturing families are different codes with different buyers. Do not treat these two totals as the whole of federal manufacturing.
I pulled prime-contract obligations from the USAspending spending-by-category API on November 20, 2026, for fiscal year 2025 (October 1, 2024 through September 30, 2025), award types A, B, C, and D. Indefinite-delivery ceilings are excluded. Agencies revise the file. Rerun it using the API docs and the method in how to use USAspending. Do not put the snapshot in a proposal as your market size.
| NAICS | Obligations | Largest subagencies in the snapshot |
|---|---|---|
| 332710 Machine Shops | $75,697,432.70 | Navy $50,890,509.67; Defense Logistics Agency $12,225,808.78; Army $4,892,521.11 |
| 332999 Other fabricated metal | $679,852,207.89 | Navy $179,789,624.08; Federal Acquisition Service $147,981,343.39; Defense Logistics Agency $127,855,086.09 |
The Navy is the largest buyer on both codes in that pull. DLA is real on both, and it is a larger share of 332999 than of machine shops. DLA is not the only door. If your process is not metal, use your own code and run the same filters. A national total for the wrong code will send you to the wrong office.
Vehicles and where the quote goes
Many DLA solicitations are posted on DIBBS. Other military and civilian solicitations are on SAM.gov. Read the notice. Submitting in the wrong system is a miss, not a technicality. The Multiple Award Schedule can carry commercial products. It is not how a build-to-print DLA part is usually bought. Whether a Schedule is worth it depends on the buyers you actually have.
State and local governments buy manufactured goods too. The Census Bureau counted 91,438 local governments in 2025 (organization report). See more than 90,000 governments.
Sample keywords
- first article test
- build to print
- machine shop
- national stock number
- source approval
- request for quotation
- production quantity
- fabricated metal
Pair the words with the NAICS code you can actually run. Choosing NAICS codes is the restraint.
The five steps for a manufacturer
Five steps, on a shop floor.
1. Get contract ready
Register in SAM.gov under the codes for parts you make. UEI and CAGE is the identifier. If the drawings you want are controlled, complete the access step the notice names before you plan to quote. A quality note that matches the inspections you really do belongs in the capability statement, not a slogan.
2. Find contracts
Search DIBBS and SAM.gov for the keywords and the material you already cut. On USAspending, see whether Navy, DLA, or another office buys your code, then follow that office. Bid or no-bid is a no when the tolerance, the material, or the first-article window does not fit the shop.
3. Gather resources and solutions
Quote material with a real lead time. Decide whether first article is in the price. Name the machine and the inspector. If a process is outside your shop, get the subcontractor now and read FAR 52.219-14 if the buy is a set-aside. Teaming is the agreement, not a logo.
4. Draft the quote or proposal
Answer the drawing. State the quantity, the delivery, and whether you are requesting a first-article waiver because you have delivered the same item before. Attach the process evidence the factor asks for. How to read a solicitation stops you from writing a company history while the factor asks for a test plan.
5. Submit the bid and follow up
Submit in the system the notice names, before the clock. After award, run the first article on the schedule and do not build the lot on hope if the clause puts that cost at your risk. If you lose, write down whether the gap was price, a missing approval, or a process you did not show.
Contract search and the pipeline keep the quote and the test date. They do not cut the part.
When I tell a shop to pass
Pass when you do not have the machine, the material, or the approval the notice requires. Pass when first article plus production cannot fit the delivery, and the clause will not pay you to start early. Pass when the price only works if nothing is scrapped. A part you have made before, for a buyer who already purchases your code, is the right first federal quote.
This is not legal advice, and a submitted quote is not an award.
FAQ
What is first article testing?
FAR 9.302 says first article testing and approval ensures the contractor can furnish a product that conforms to contract requirements before the rest of the quantity is treated as routine production. FAR 52.209-3 is the contractor-testing clause. You test the units the contract names, submit a report, and wait for approval, conditional approval, or disapproval. Production of the balance before approval is at your risk unless the contract authorizes it.
When is first article testing not required?
FAR 9.304 says testing and approval is normally not required for research or development, for products that must be qualified before award, for products normally sold in the commercial market, or for products covered by complete specifications unless the requirements are so novel or exacting that testing is still needed. The solicitation can also waive testing when you have already delivered identical or similar supplies the government accepted. The waiver is requested. It is not assumed.
Which NAICS codes fit a small machine shop or fabricator?
NAICS 332710, Machine Shops, has a 500-employee size standard in 13 CFR 121.201. NAICS 332999, All Other Miscellaneous Fabricated Metal Product Manufacturing, has a 750-employee standard. The code on the notice controls. A shop should not register a code for parts it cannot make.
How much federal work showed up under those codes in fiscal year 2025?
For prime award types A, B, C, and D, the USAspending API returned $75,697,432.70 for NAICS 332710 and $679,852,207.89 for NAICS 332999. The Navy was the largest awarding subagency on both. The Defense Logistics Agency was $12,225,808.78 on 332710 and $127,855,086.09 on 332999 in that snapshot.
Does the lowest unit price win a manufacturing buy?
Price is always part of the decision, and on many parts buys the acceptable offer with the lowest evaluated price wins under FAR 15.101-2. On a tradeoff, FAR 15.101-1 lets the government pay more for a shop that proves it can make the part. A low number without the process, the equipment, and similar work does not show capability.
Where do DLA quotes get posted?
Many DLA solicitations are posted on DIBBS. Many other manufacturing solicitations are on SAM.gov. Read the notice for the system that actually receives the quote. A quote in the wrong system is not a quote.
Start with a part you have already made
Pick one solicitation whose material and tolerance you have run. Price the first article separately if the clause includes it, and show the machine that will cut the part.
Start for Free and keep the drawing, the quote, and the due date together. To walk a live package with us, Book a Call.