Construction Government Contracts: Subcontracting Limits, Bonding, and Davis-Bacon

How the government scores a construction bid: FAR 52.219-14 subcontracting limits, Miller Act bonds, Davis-Bacon wages, and the license and crew for that site.

A construction award goes to the firm that can bond the price, pay the Davis-Bacon wages on the site, hold the license the place of performance requires, and still perform the share of the work the set-aside clause demands. The lowest number does not survive a missing bond, a wage below the determination, or a subcontract plan that hands the job to firms that are not similarly situated. If you build, renovate, or run a specialty trade, this is the bid you already know how to estimate, with those three rules added on top.

This guide sits under the construction industry page. That page is the short map. This one is how I walk a builder through the evaluation.

How the government evaluates a construction bid

I score a construction pursuit on six things, in the order they actually knock people out.

Licenses. The state, and sometimes the city, decides who may pull the permit and sign the work. A federal notice does not erase that. If the place of performance requires a license you do not hold, and the solicitation does not let a licensed subcontractor cover it, the notice is a pass. Domain authority here is simple and public: the legal name on your SAM.gov record, the license number on your website, and the qualifier on the state roster should be the same company. An evaluator who cannot find the license will not infer it from a slogan.

Bonding. Bonding capacity is a filter, not a writing problem. If you cannot get a bid guarantee and, when the price requires them, performance and payment bonds, you are not ready for that estimated price. A letter you hope to get after award is not capacity on bid day.

Labor and the wage. Davis-Bacon is a floor for the laborers and mechanics on the site. Your estimate starts with the classifications and rates on the wage determination in the package, plus fringe. A number built from your private-job labor rate, when that rate is lower, is not a clever bid. It is a bid you cannot perform legally.

Experience. The government wants a superintendent and a project manager who have built this type of work, at this rough scale, and a company record that matches. A resume for a high-rise superintendent on a small roofing package, or the reverse, is not experience. It is a mismatch. Past performance when you have none is how I tell a new firm which notices to skip.

Capabilities. Crew size, equipment, the subcontractor list, and whether you can staff the site for the duration. Drawings are part of the requirement. A narrative that never mentions the sheet numbers is not a construction proposal.

Pricing. Some construction buys are sealed bids, where a responsive, responsible offer with the low price wins. Some are negotiated. A tradeoff under FAR 15.101-1 can prefer a stronger approach when the solicitation says it will. FAR 15.101-2 takes the lowest evaluated price among offers that are technically acceptable. Read which one you are holding before you sharpen the pencil or spend pages on means and methods. How to price a government contract bid is the build-up. It is not your rate sheet.

On a negotiated job the superintendent’s resume is part of the score. The projects on that resume, the safety record the notice asks for, and the trades you will self-perform are labor and experience written down. A line that says “full service general contractor” does not replace them.

The subcontracting limit, the bond, and the wage

Three clauses decide more construction bids than the cover letter does.

Limitations on subcontracting

FAR 52.219-14, Limitations on Subcontracting, does not apply to every job. It applies to contracts set aside for the small-business concerns identified in the clause, to certain sole-source awards, to some orders under multiple-award contracts, and to HUBZone price-evaluation-preference awards unless the preference was waived. The unrestricted portion of a partial set-aside is outside the clause.

When the clause is in the contract and the NAICS code is general construction, you agree you will not pay more than 85 percent of the amount paid by the government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. For construction by special trade contractors, that cap is 75 percent. A similarly situated entity is a first-tier subcontractor, including an independent contractor, that has the same small-business program status that qualified you for the award and is small for the size standard of the NAICS code you assign to the subcontract. Work that a similarly situated entity further subcontracts still counts toward the cap you cannot exceed.

Put that cap in the estimate before anyone falls in love with a large subcontractor quote. On a set-aside you cannot buy the whole building from firms that do not share your status and still call yourself the prime. A joint venture performs the applicable percentage in aggregate. In an SBA-approved mentor-protégé joint venture, and in an 8(a) joint venture, the protégé or 8(a) participant performs at least 40 percent of the work the joint venture performs, and that share has to be more than administrative functions.

Set-asides and subcontracting plans is the wider small-business map. The clause in your package still controls the percentage.

Bonding

FAR 28.102-1 states the requirement from 40 U.S.C. chapter 31, subchapter III, the statute formerly known as the Miller Act. Performance and payment bonds are required for any construction contract exceeding $150,000, except for a waiver the contracting officer can make for work in a foreign country when a bond is impracticable, or another waiver the statute allows. For construction contracts greater than $35,000 but not greater than $150,000, the contracting officer selects two or more payment protections. The options include a payment bond, an irrevocable letter of credit, and a tripartite escrow agreement.

FAR 52.228-15, Performance and Payment Bonds—Construction, says that unless the contract price is at or below the threshold in FAR 28.102-1(a), the successful offeror furnishes a performance bond (Standard Form 25) at 100 percent of the original contract price and a payment bond (Standard Form 25A) at 100 percent of the original contract price. Original contract price has a definition in the clause. It is the award price, or the estimated total for a requirements contract, or the specified minimum for an indefinite-quantity contract. It does not include options except those exercised at award.

The Small Business Administration guarantees bid, performance, and payment bonds issued by certain surety companies. The program page is SBA surety bonds. A guarantee program is not a bond. You still need a surety that will write the bond for this contract price. If the surety will not, mark the notice a pass. Chasing it because the title says renovation wastes the estimator.

Davis-Bacon

FAR 22.403-1 describes the Davis-Bacon Act. Contracts in excess of $2,000 to which the United States or the District of Columbia is a party, for construction, alteration, or repair, including painting and decorating, of public buildings or public works within the United States, contain a clause that no laborer or mechanic employed directly on the site of the work shall receive less than the prevailing wage rates determined by the Secretary of Labor. The clause is FAR 52.222-6.

Wage determinations are on SAM.gov wage determinations. Price the classifications in the determination attached to your solicitation, including fringe. A determination from another county is the wrong floor. Recurring custodial or grounds work often falls under the Service Contract Labor Standards instead. The facilities guide is that other wage rule. The clause in your package decides.

Who buys construction, and what fiscal year 2025 shows

The main code I use for commercial and institutional building is NAICS 236220. It is not the only construction code. Highway, heavy civil, and specialty trades have their own. Use 236220 when that is the work, and use the code on the notice when it is not.

I pulled federal prime-contract obligations from the USAspending spending-by-category API on November 20, 2026. The filters were fiscal year 2025 (October 1, 2024 through September 30, 2025), NAICS 236220, and award type codes A, B, C, and D: BPA calls, purchase orders, delivery orders, and definitive contracts. Indefinite-delivery vehicle ceilings are not in this total, so a large IDIQ ceiling is not treated as money spent. Agencies revise the file. The API documentation is on api.usaspending.gov. Rerun the filters before you put a figure in a plan. How to use USAspending is the method. These dollars are a snapshot of those filters, not a bid price.

For those filters, NAICS 236220 showed $30,642,235,679.74 in obligations. The largest awarding subagencies were:

Awarding subagency Obligations
Department of the Army $7,794,845,075.13
Department of the Navy $6,532,029,396.87
U.S. Customs and Border Protection $5,106,276,090.60
Department of Veterans Affairs $2,809,987,395.78
Department of the Air Force $2,806,167,620.47
Public Buildings Service $1,198,500,151.24

Army, Navy, Air Force, Customs and Border Protection, VA, and GSA’s Public Buildings Service are the offices behind those dollars. In 13 CFR 121.201, as displayed on eCFR on November 18, 2026, NAICS 236220 carries a $45.0 million size standard. Small under that standard still has to bond and staff the particular project.

State and local construction is the other market. The Census Bureau’s Government Organization Summary Report reported 90,837 local governments in 2022 and 91,438 by 2025. Those governments, plus the 50 states, post on their own portals. I break the count down in more than 90,000 governments. California eProcure and the Texas Electronic State Business Daily are two that resolve. Your state has its own.

Vehicles and how the work is bought

Construction is bought as a one-time contract for a named site and as orders under an indefinite-delivery contract. A task order still has a site, a wage determination, and a bond rule when the order says so. A seat on a vehicle is not the building.

GSA’s Multiple Award Schedule is not how most vertical construction is bought. Whether a Schedule is worth it is a separate decision. Federal notices are on SAM.gov. When the notice requires registration, start at SAM.gov entity registration under FAR 4.1102.

Sample keywords

Search the words the notice uses, not only the words on your truck. A short list I give builders:

  • commercial and institutional building
  • design-bid-build
  • renovation and alteration
  • performance and payment bond
  • Davis-Bacon wage determination
  • indefinite-delivery construction
  • set-aside general construction
  • special trade construction

Choosing NAICS codes keeps the code list honest. A keyword that returns highway work you cannot bond is noise.

The five steps for a construction firm

The sequence I use on every pursuit is the same five steps, applied to this trade. The full version is five steps to win government contracts. Here is what each step looks like when the work is a building.

1. Get contract ready

Get the state contractor license for the places you will build. Register in SAM.gov and keep the legal name identical to the license. Pick codes you can staff: 236220 for commercial and institutional buildings, and the specialty codes if that is the truck. Open the surety relationship before you need a bid bond. The single-job and aggregate limits the surety will support are your ceiling. Register on the state portal too. Federal registration does not log you into that site.

2. Find contracts

Run the keywords above on SAM.gov, then the state portal, for a place of performance your crew can reach. Read the estimated price against the bond line before you download every drawing. Use USAspending to see which office keeps buying your code in your state, then watch that office. Bid or no-bid is the gate. A renovation you cannot bond is a no-bid, written down, so you stop reopening it.

3. Gather resources and solutions

List what you will self-perform. Get subcontractor quotes and mark which firms are similarly situated if FAR 52.219-14 applies. A large trade partner can be right on an unrestricted job and can blow the 85 or 75 percent cap on a set-aside. Put the wage determination in the estimate. Collect the superintendent and project manager resumes the notice asks you to name. If a bid bond is due with the offer, gather it now.

4. Draft the proposal

On a sealed bid, the draft is the bid form, the acknowledgments, the subcontractor listing, and a price that includes the wage. On a negotiated RFP, read the instructions and the factors first. How to read a solicitation is that pass. Write means and methods to the drawings and name the sheets. Show the self-performance share if FAR 52.219-14 is in the contract.

5. Submit the bid and follow up

Submit in the channel, format, and time zone the notice names. Amendments move dates and change drawings. A bid on yesterday’s set is not a bid. If you lose a negotiated award, take the debrief and write down whether you lost on price, on the bond, or on the approach.

Contract search and the pipeline hold the notice, the bond ceiling, and the due date. They do not write the bond.

When I tell a builder to pass

Pass when the bond will not cover the estimate. Pass when the license is missing and you cannot team with someone who holds it under a real agreement. Pass when the set-aside clause is in the package and your only plan is to subcontract nearly all of the work to firms that are not similarly situated. Pass when the wage determination makes the job unprofitable at a price you can still win. A pass you can explain is a result. A bid you had no business submitting is a cost.

This is not legal advice, and a complete bid is not a promise of award.

FAQ

Does FAR 52.219-14 apply to every construction contract?

No. The clause applies to small-business set-asides and to certain sole-source awards described in the clause itself, including some orders under multiple-award contracts. An unrestricted project that does not include the clause is a different bid. Read the solicitation before you plan the subcontract split.

How much of a set-aside construction job can I subcontract?

Under FAR 52.219-14, on general construction you will not pay more than 85 percent of the amount the government pays, excluding the cost of materials, to subcontractors that are not similarly situated entities. On construction by special trade contractors the cap is 75 percent on that same basis. Work a similarly situated subcontractor passes on still counts against your cap.

When do I need performance and payment bonds?

FAR 28.102-1 says the Miller Act, 40 U.S.C. chapter 31, subchapter III, requires performance and payment bonds for any construction contract exceeding $150,000, with limited waivers. FAR 52.228-15 sets each bond’s penal amount at 100 percent of the original contract price when the price is above that threshold. Between $35,000 and $150,000 the contracting officer selects alternative payment protections.

What is the Davis-Bacon threshold?

FAR 22.403-1 says contracts in excess of $2,000 for construction, alteration, or repair, including painting and decorating, of public buildings or public works in the United States contain a clause requiring laborers and mechanics on the site to be paid at least the prevailing wage rates determined by the Secretary of Labor. The clause is FAR 52.222-6. The wage determination in your package is the one you price.

What size standard applies to commercial building?

NAICS 236220, Commercial and Institutional Building Construction, has a $45.0 million size standard in the table at 13 CFR 121.201. Heavy civil and specialty trades use other codes and other standards. The code on the notice is the one that decides whether you are small for that bid.

Where should I look besides SAM.gov?

Federal construction notices are on SAM.gov. State departments of transportation and local governments post on their own portals. The Census Bureau counted 91,438 local governments in 2025. A SAM.gov search is not the whole construction market.

Start with a building you can bond

Pick one notice in a place you can staff, with a price your surety will bond and a wage determination you have priced. Put the subcontract split on paper before you fall in love with the job.

Start for Free and track that notice from the wage determination through submission. If you want to walk a live package with us, Book a Call.