Janitorial and Facilities Maintenance Government Contracts

How janitorial bids are won on staffing hours, Service Contract Act wages, AbilityOne, and whether your crew can actually work that building every night.

Janitorial and facilities maintenance awards go to the firm that can put the right number of people in that building, on that schedule, at or above the wage determination, with a supervisor who has cleaned a site of this size. The government is buying labor and a price. A slogan about sparkling results does not survive a walk-through, and a price built under the wage floor does not survive performance. If you run a cleaning route, a night crew, or a small facilities shop, the bid in front of you is a staffing plan written in dollars.

This guide sits under the facilities and janitorial industry page. Grounds maintenance is its own code and its own guide. Use this one when the work is the building.

How the government evaluates a janitorial bid

I look at six things, and the first three decide most of the losses I see.

Labor. Count the tasks, the frequencies, and the hours. Restrooms, floors, trash, and the locked rooms that need an escort all consume time. A production rate from a private office is often wrong in a hospital, a school, or a secure federal building. The staffing plan is the technical proposal, even when the solicitation never uses the word technical.

Pricing. Build the price from the hours times the wage determination, plus fringe, supervision, supplies, and a fee you can live on. How to price a government contract bid is the vocabulary. If the solicitation is lowest price technically acceptable under FAR 15.101-2, the lowest evaluated price among acceptable staffing plans wins. An essay does not beat a lower acceptable price. If it is a tradeoff under FAR 15.101-1, a plan that shows substitutes and supervision can beat a cheaper plan the evaluator does not believe, but only when the solicitation says it will trade.

Experience. The question is whether you have cleaned a building of this size, on this schedule, at this security level. A resume for the project manager and the on-site supervisor should show that. A famous client in an unrelated line of work is not relevance. Past performance when you have none tells you when to pass instead of inventing a building.

Licenses and access. Janitorial rarely needs a professional license the way a clinic does. Some states and cities still require a contractor registration, and the building may require insurance limits, badges, background checks, or a clearance for the night supervisor. If the notice lists it, it is part of ready. Promising to be on site Monday when the badge office takes weeks is how a low price becomes a default.

Capabilities. Supplies, equipment, a substitute crew, and a quality-control person who will walk the building the way the inspection schedule says. A chart that works only if nobody calls out is not a plan.

Domain authority. Your SAM.gov legal name, your insurance certificate, and the buildings you name as past work should describe the same company a contracting officer can look up. A website that says you clean the country, and a resume file that shows one small office, is a gap the evaluator can see without a site visit.

The wage rule, the five-year cap, and AbilityOne

Service Contract Labor Standards

FAR 22.1003-1 applies subpart 22.10 to government contracts whose principal purpose is to furnish services in the United States through the use of service employees, with the exemptions in 22.1003-3 and 22.1003-4. It also applies to subcontracts at any tier under those contracts. The subpart does not apply to an individual service line inside a contract whose principal purpose is not services. The name of the contract does not decide coverage.

FAR 22.1002-1 says service contracts over $2,500 shall contain mandatory provisions on minimum wages and fringe benefits, safe and sanitary working conditions, notice to employees, and equivalent federal employee classifications and wage rates. The clause you will see is FAR 52.222-41. Wage determinations are on SAM.gov wage determinations. Health, welfare, and paid leave in the determination are part of the rate. Leaving them out to look cheaper produces a number you cannot legally pay.

The same section says that under 41 U.S.C. 6707(d), service contracts may not exceed 5 years. A base period plus option years can fill that window. Exercising an option is the government’s choice. Do not price year five as guaranteed revenue, and do not ignore it when you buy equipment you will only recover if every option is picked up.

If the work is construction, alteration, or repair of a public building, Davis-Bacon may be the wage rule instead. That is the construction guide. Read the clause you were given.

AbilityOne comes first when the service is on the list

FAR 8.704 requires ordering offices to obtain supplies and services on the Procurement List from AbilityOne participating nonprofit agencies when they are available in the period required. For services, the priority is AbilityOne, then Federal Prison Industries or commercial sources. No other FAR provision is to be read as an exception to buying what is on the list. The list is published by AbilityOne. If the building’s custodial service is on it, a commercial proposal is not the path. Find a different building.

The 50 percent subcontracting limit

On a set-aside, FAR 52.219-14 applies when the clause says it does. For services other than construction, you will not pay more than 50 percent of the amount paid by the government for contract performance to subcontractors that are not similarly situated entities. A similarly situated entity shares the small-business program status that qualified you and is small for the NAICS code you assign to the subcontract. Work that firm further subcontracts still counts against your cap. You cannot hand the whole building to a large firm and call yourself the prime. Set-asides and subcontracting plans is the wider map.

Who buys janitorial work, and what fiscal year 2025 shows

The main code is NAICS 561720, Janitorial Services. In 13 CFR 121.201, as displayed on eCFR on November 18, 2026, that code carries a $22.0 million size standard.

I pulled federal prime-contract obligations from the USAspending spending-by-category API on November 20, 2026. Filters: fiscal year 2025 (October 1, 2024 through September 30, 2025), NAICS 561720, award type codes A, B, C, and D (BPA calls, purchase orders, delivery orders, and definitive contracts). Indefinite-delivery ceilings are excluded. Agencies revise the data. The endpoint list is on api.usaspending.gov. Rerun the filters before you put a number in a plan. How to use USAspending is the method.

For those filters, NAICS 561720 showed $1,789,649,762.95. The largest awarding subagencies were:

Awarding subagency Obligations
Department of the Army $514,664,267.54
Department of the Navy $273,321,706.96
Department of the Air Force $238,206,230.20
Department of Veterans Affairs $109,179,447.06
Defense Health Agency $106,247,610.92
Public Buildings Service $66,416,337.14

Military installations, VA hospitals, Defense Health Agency facilities, and GSA’s Public Buildings Service are the federal pattern. Cities, counties, schools, and special districts are often the larger market for a local crew. The Census Bureau’s organization report counted 91,438 local governments in 2025. They post on their own sites. See more than 90,000 governments.

Vehicles

Recurring custodial work is usually a base period plus options, or orders under a blanket purchase agreement or an indefinite-delivery contract. Read the minimum. A large ceiling with a tiny minimum is not a full route until the orders arrive.

The GSA Multiple Award Schedule has facilities categories some firms use. It is optional. A school district may never buy from it. Is a GSA Schedule worth it is that decision. Federal notices are on SAM.gov.

Sample keywords

Search the words the statement of work uses:

  • custodial services
  • janitorial services
  • recurring building services
  • wage determination janitor
  • square footage and frequency
  • base operations support
  • green cleaning
  • facilities maintenance services

NAICS selection keeps 561720 from being confused with 561210 facilities support. They are not the same crew and not the same size standard.

The five steps for a cleaning firm

The sequence is the same five steps I teach everywhere. The long version is five steps to win government contracts. This is the janitorial version.

1. Get contract ready

Register in SAM.gov if you will bid federal buildings, and keep the UEI record active. What a UEI and CAGE code are is the short version. Add the state or local vendor registration for the governments whose buildings you can actually reach. Line up insurance at the limits your last notice asked for, not at a guess. If a building type you want requires badges or background checks, learn the timeline before you promise a start date.

2. Find contracts

Search the keywords above for your geography. On USAspending, open the awarding office, not just the national total, and watch the contracts that are nearing the end of the five-year window. Bid or no-bid starts with a simple test: can you put people in that building? If the answer is no, pass. Check the AbilityOne list before you treat a federal building as open.

3. Gather resources and solutions

Walk the site when the notice allows it. The square footage in the attachment and the building you see are not always the same. Build the hour count from the walk, then the wage. Get supply pricing. Name the supervisor and the substitutes. If you need a subcontractor for windows, a second city, or periodic floors, get the agreement and check the 50 percent cap before you describe them as yours. Teaming is how that agreement should work.

4. Draft the proposal

Write the staffing plan to the frequencies in the statement of work. Show supervision, the quality-control walk, and what happens when someone calls out. Put the wage build-up where the pricing sheet asks for it. How to read a solicitation keeps you from answering a history-of-the-company question the evaluator did not ask.

5. Submit the bid and follow up

Submit in the format and by the time the notice names. Amendments change frequencies and wage determinations. After award, perform to the inspection schedule. Deductions for failed inspections are how a cheap monthly number stops being cheap. If you lose, take the debrief and write down whether the gap was hours, price, or experience.

Contract search and the pipeline keep the recompete date and the wage determination with the notice. They do not staff the building.

When I tell a cleaning firm to pass

Pass when you cannot put people in the building. Pass when the service is on the AbilityOne Procurement List. Pass when your only price works if you pay under the wage determination. Pass when the set-aside would require you to self-perform half the dollars and you planned to broker the whole route. A local crew that knows three buildings will beat a national story that cannot name a supervisor. Bid the buildings you can reach.

This is not legal advice, and a careful staffing plan is not a promise of award.

FAQ

What NAICS code do janitorial contracts use?

NAICS 561720, Janitorial Services, is the usual custodial code. Facilities support services are often 561210, which is a different competition. The code printed on the notice is the one that sets the size standard and the subcontracting rule.

Do janitorial contracts have to pay a wage determination?

When the principal purpose is services in the United States through service employees, FAR 22.1003-1 and FAR 22.1002-1 apply. Service contracts over $2,500 contain mandatory provisions on minimum wages and fringe benefits. Price the wage determination attached to the solicitation, including health and welfare. A rate under that floor is not a strategy.

How long can a service contract run?

FAR 22.1002-1 says that under 41 U.S.C. 6707(d), service contracts may not exceed 5 years. A base year plus options is still common. Options are exercised by the government. They are not a promise that the route continues.

Can I bid a building that is on the AbilityOne Procurement List?

Not as a commercial prime if the service is on the Procurement List. FAR 8.704 requires purchase from AbilityOne participating nonprofit agencies when the service is on that list, ahead of commercial sources. Check the list before you spend a week on a staffing plan.

How much of a set-aside janitorial contract can I subcontract?

If FAR 52.219-14 is in the contract and the NAICS code is for services other than construction, you will not pay more than 50 percent of the amount the government pays for contract performance to subcontractors that are not similarly situated entities. You cannot hand the building to a large firm and call yourself the prime.

What did the federal government obligate under NAICS 561720?

For fiscal year 2025, limited to prime award types A, B, C, and D, the USAspending spending-by-category API returned $1,789,649,762.95 in obligations for NAICS 561720. The Army, Navy, and Air Force were the largest awarding subagencies in that snapshot. Rerun the filters before you use the figure in a plan.

Start with one building you can staff

Pick a notice whose square footage you have walked, or can walk, and whose wage determination you have priced. If you cannot name the supervisor, you are not ready to submit.

Start for Free and keep the staffing plan next to the notice. If you want to walk a live solicitation with us, Book a Call.